How long does building control approval Take Northern Ireland?
You should find out if your plans have been approved within about 8 weeks of making your original application, although large or complex applications can take longer.
Do I need a building warrant East Dunbartonshire?
A Building Warrant is needed before any building or demolition is carried out. If you believe works have been carried out without a Building Warrant, contact the Council and we will investigate and advise you on the course of action required to rectify the matter.
When was building control introduced in Northern Ireland?
Primary legislation and amendments The Building Regulations (Northern Ireland) Order 1979(external link opens in a new window / tab) is the primary legislation for building regulations in Northern Ireland. It came into operation in January 1980.
What drawings are required for a building warrant?
BUILDING PLANS Plans submitted for warrant should be drawn to a scale of 1:50 and certainly not less than 1:100 and must be in metric scale. Three sets of all plans must be submitted, though, it some instances it may be necessary to submit further copies if the Verifier needs consultations with other statutory bodies.
What size of garage can I build without planning in Northern Ireland?
BUILDING REGULATIONS – Northern Ireland the floor area of the detached garage is less than 15 square metres. the floor area of the garage is between 15 square metres and 30 square metres, provided the garage is at least one metre from any boundary, or it is constructed from substantially non-combustible materials.
Can I build a garage without planning permission Northern Ireland?
Planning permission is not required for a detached garage or car port provided that: 1. The ground area covered by the garage/car port and any other buildings within the boundary of the property, excluding the original house, is not more than half the total area of the property. 3.
What is a building warrant required for?
A building warrant is the legal permission to start building work, or to convert or demolish a building. If you carry out work that requires building warrant without first obtaining a warrant you are committing an offence. Verifiers are responsible for issuing building warrants.
Do I need Building Control Northern Ireland?
Yes, alterations of a structural nature require Building Control approval. Generally the installation of a beam or lintel is required. The advice of a Structural Engineer may be necessary. If in doubt, ask.
Do I need Building Control to remove an internal wall?
Removal of Internal Walls (non load-bearing) The removal of a non load-bearing wall does not require the submission of a Building Regulation application. However, if this affects fire precautions, such as removing walls to staircase enclosures an application is required.
What happens if you build without a building warrant?
If a warrant is not obtained this will lead to additional costs for the processing of a completion certificate that will normally be required when selling your property. The verifier may also require work to be opened up to show that compliance with the regulations has been achieved.
Do you need planning permission for garage NI?
Planning permission is not required for a detached garage or car port provided that: 1. The garage is used for domestic purposes only. The maximum eaves height of the garage/car port is 2.5 metres if it is within 2 metres of the boundary of the curtilage of the house.