How do you make construction submittals?

How do you make construction submittals?

Steps

  1. Navigate to the project’s Submittals tool.
  2. Click + Create > Submittal.
  3. Create a new submittal as follows: Add General Information. Update the Delivery Information. Create a Distribution List. Calculate Submittal Schedule Information (If Enabled) Apply a Submittal Workflow Template. Add Users to the Submittal Workflow.

What should be included in a construction submittal?

Submittals in construction management are shop drawings, material data, samples, and product data. Submittals are required primarily for the architect and engineer to verify that the correct products will be installed on the project.

What is the purpose of a submittal in construction?

The submittal review process provides important system of checks and balances during the construction phase of a project. The purpose is to ensure that the end result conforms to the design intent depicted in the construction documents and meets the expectations of the owner.

What is an example of a submittal?

Submittal items include schedules, meeting minutes, product data, shop drawings, test data, product samples, warranties, and operations and maintenance (O&M) data. A large project, with dozens of subs, may have 500 or more individual submittals.

What is a RFI in construction?

A request for information (RFI) is a document used during the construction process to get clarification about the necessary details of a project. Construction RFIs are extremely common: Navigant Construction found that roughly 10 RFIs occur for every $1 million spent on construction.

What are the types of contracts in construction?

Types of construction contracts

  • Cost (Plus) Contracts.
  • Lump Sum Contracts (Also known as Fixed Price Contracts)
  • Piecework Contracts.
  • Unit Pricing Contracts.
  • GMP Contracts (Guaranteed Minimum Price Contract)
  • Rate Contracts.
  • Target Contracts.
  • Materials and Labor supply Contracts.

What are the submittal procedures?

1.6 SUBMITTAL PROCEDURES A. Prepare and submit submittals required by individual Specification Sections. Types of submittals are indicated in individual Specification Sections. 1. Email: Prepare submittals as PDF package, and transmit to Engineer by sending via email. Include PDF transmittal form. Include information in email subject line as

What are Submittals in construction projects?

Submittals. A submittal in construction management is a project document used to get specific information or items from a subcontractor, such as shop drawings, material data, product data, and samples (carpet, paint, flooring, etc.). The project manager creates a submittal to request information or items related to the project…

What are contractor submittals?

Submittals are how contractors inform architects and engineers about the materials they plan to use and how they will complete the project. They ensure that major systems will have the appropriate utilities hooked up.

What is material submittal?

Material submittals are official documents provided from the constrictors’ end to those procuring that material from them. It’s more than an official documentation of acceptance. It is a document which mentions additional details, vital for record-keeping and future reference respective to the product in question.